Do I Still Need to Conduct A Stormwater Annual Comprehensive Inspection? Reply

CAPACCIO recently received questions related to the Stormwater Annual Comprehensive Inspection (ACI) which is a requirement under the 2008 Multi-Sector General Permit (MSGP). Specifically permitees wanted to know if they had to conduct the ACI on or before September 29 and also submit the report this year.

We developed this flow diagram to help companies determine if they have to conduct and submit a Stormwater ACI report.

http://www.capaccio.com/handouts/Inspection_requirements.pdf

Please contact Chris Walton at cwalton@capaccio.com or at 508.970.0033 ext. 139 if you need further clarification.

Comment

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s